Tests Done
Here is the series of successfull test conducted by us.
VSLV 1.0
VSLV 1.0 was successfully test fired on 22nd August,2017 at 8:15 AM IST ,upto a height of 800m. Mission 1 tested Launch capability with Basic electronics (GPS, Altimeter & parachute ejection system).
VSLV 2.0
VSLV 2.0 was successfully test fired on 1st January, 2018 at 11:50 AM IST,upto a height of 1.7km. In Mission 2 Higher altitude was achieved with fully working payload. Payload Features: Altitude measurement, Pressure measurement, Air speed measurement, Temperature and Humidity measuring in ambient atmosphere.
VSLV 3.0
VSLV 3.0 GRAVITON was succesfully fierd on 30th March 2018 at 08:31:53 IST,upto a height of 3.89km. In Mission 3 altitude of 13000ft (4km) was achieved with Upgraded Rocket Structure and advanced payload. A Specially designed algorithm was installed to work with GSM Module, which gathered data on cellular signal strength and network.
VSLV 3.1
VSLV 3.1 was successfully fired on 10th September 2018 at 11:03 IST,upto a height of 3.91km. The same apogee was achieved with Modifications in Propellant for greater thrust. On board Flight Camera and In-house Ground station were setup.
VSLV 3.2
VSLV 3.2 was successfully test fired on 25th November 2018 at 11:35 AM IST,upto a height of 1km. A series of 3.X Launches to test various subsystems, then integrate it for our next (fourth) mission was done. Ejection and Dual Deployment of Parachute was tested along with Live Telemetry and Video feed.